Solutions · Electricity & Grid

Electricity & Grid

From the substation to the meter: reliability indices, storm prediction, asset health, and hosting capacity in apps your team controls.

Sound familiar?

What slows electricity teams down today.

These are the gaps DOTA was built to close, without a multi-year systems program.

1

SAIDI/SAIFI reporting still runs on fragile spreadsheets

2

Outage, asset, and AMI data lives in disconnected systems

3

Storm and wildfire seasons demand answers IT can’t deliver in time

4

Capital prioritization lacks asset-risk analytics

Signature metrics
SAIDI / SAIFIHosting capacityAsset health index
Source systems
OMSADMSGISAMISCADA

Designed to fit your compliance reality

IEEE 1366NERC CIPFERC
Prebuilt apps

Where Electricity teams start.

Tailor a proven app to your fleet instead of starting from a blank canvas.

Electric

Outage Analytics & Reliability

Compute IEEE 1366 reliability indices automatically and pinpoint chronic outage clusters by feeder, circuit, and cause.

SAIDISAIFICAIDI / MAIFI
OMS · SCADA · GIS · AMI
Electric

Predictive Outage & Storm Response

Forecast outage probability and crew needs ahead of storms by fusing weather, asset, and AMI last-gasp signals.

Predicted ETRCustomers at riskCrew utilization
OMS · Weather · GIS · AMI
Electric

T&D Asset Health & Risk Scoring

Score transformers, breakers, and lines by condition and consequence to target capital where failure risk is highest.

Asset health indexDGAProbability of failure
SCADA · GIS · CMMS · DGA labs
Electric

Hosting Capacity & Interconnection

Model feeder thermal and voltage headroom to clear the DER interconnection queue faster.

Hosting capacity (MW)Feeder loading %Voltage rise
GIS · ADMS · Power-flow · AMI
Electric

Voltage / VAR & Power Quality

Detect voltage excursions, harmonics, and flicker to support CVR and power-quality programs.

ANSI C84.1 bandTHDPower factor
SCADA · ADMS · PQ meters · AMI
Electric power

Load & Demand Forecasting

Short- and long-term forecasts at system, feeder, and customer level, including the data-center and electrification load growth reshaping your peak.

Peak demand (MW)MAPECoincident peak
AMI/MDM · EMS · Weather · GIS

Put DOTA on your electricity data.